A project in Swindon for a valued client. On this project we are carried out:
- Repair existing pump station and pumping main
- Trial holes on all existing underground plant using a suction excavator to save any damages
- Install new pump station 2m wide x 4.5m length 3.7m deep
- Supply and install steel trench 4.5m deep and hydraulic frames
- 160m 90mm pe pumping main
- including all reingstating
- risk assessment method statement
- health and safety package
If any one would like any work done please drop us an email on mrdhutilities@hotmail.com
